Telecom
Taking on a Complex Mobile Challenge
Mission
This project began with a challenge. The customer, a leading Israeli cellular provider (at that time using the Orange brand) needed to build a 1,600m2, 4.5MW data center in 3 months.
Solution and Work Process
Alexander Schneider accepted the challenge as a turnkey project. The scope included civil works, installing Liebert air-conditioning systems, racks and cabinets, UPS systems, Panduit OM3 and OM4 Fiber up to 40Gb Ethernet, power distribution and monitoring.
Result
Within 3 months of receiving a 1,600m2 underground shell, Alexander Schneider delivered an operational 4.5MW, N+1 data center able to support high density and built for best practices.
Data center design: Mickey Ziv